Daniel:Notebook/ComboLock/ExperimentList: Difference between revisions
Jump to navigation
Jump to search
>Djacobse |
>Djacobse |
||
Line 8: | Line 8: | ||
<ol> | <ol> | ||
<li>Positive Control Amplicon Production</li> | <li>Positive Control Amplicon Production (08/05/2016)</li> | ||
<dynamicpagelist> | <dynamicpagelist> | ||
category=ComboLock | category=ComboLock | ||
category=20160805 | category=20160805 | ||
</dynamicpagelist> | </dynamicpagelist> | ||
<li>Positive Control Amplicon Test</li> | <li>Positive Control Amplicon Test (08/18/2016)</li> | ||
<dynamicpagelist> | <dynamicpagelist> | ||
category=ComboLock | category=ComboLock | ||
category=20160818 | category=20160818 | ||
</dynamicpagelist> | </dynamicpagelist> | ||
<li>Positive Control Amplicon Production 2</li> | <li>Positive Control Amplicon Production 2 (08/23/2016)</li> | ||
<dynamicpagelist> | <dynamicpagelist> | ||
category=ComboLock | category=ComboLock | ||
category=20160823 | category=20160823 | ||
</dynamicpagelist> | </dynamicpagelist> | ||
<li>Positive Control Amplicon Test 2</li> | <li>Positive Control Amplicon Test 2 (08/22/2016)</li> | ||
<dynamicpagelist> | <dynamicpagelist> | ||
category=ComboLock | category=ComboLock | ||
category=20160822 | category=20160822 | ||
</dynamicpagelist> | |||
<li>Positive Control Dilution-X2(08/26/2016)</li> | |||
<dynamicpagelist> | |||
category=ComboLock | |||
category=20160826 | |||
</dynamicpagelist> | |||
<li>Positive Control-X3 (08/29/2016)</li> | |||
<dynamicpagelist> | |||
category=ComboLock | |||
category=20160829 | |||
</dynamicpagelist> | </dynamicpagelist> | ||
</ol> | </ol> |
Revision as of 20:09, 12 September 2016
Experiment List
This page is a list of experiments performed in ComboLock and the corresponding dates to those experiments
August 2016
- Positive Control Amplicon Production (08/05/2016) <dynamicpagelist> category=ComboLock category=20160805 </dynamicpagelist>
- Positive Control Amplicon Test (08/18/2016) <dynamicpagelist> category=ComboLock category=20160818 </dynamicpagelist>
- Positive Control Amplicon Production 2 (08/23/2016) <dynamicpagelist> category=ComboLock category=20160823 </dynamicpagelist>
- Positive Control Amplicon Test 2 (08/22/2016) <dynamicpagelist> category=ComboLock category=20160822 </dynamicpagelist>
- Positive Control Dilution-X2(08/26/2016) <dynamicpagelist> category=ComboLock category=20160826 </dynamicpagelist>
- Positive Control-X3 (08/29/2016) <dynamicpagelist> category=ComboLock category=20160829 </dynamicpagelist>
July 2016
- C Probe SOD1/VIM Test 2 (7-1-2016) <dynamicpagelist> category=ComboLock category=20160701 </dynamicpagelist>
- Sequential Hybridization Test (7-5-2016) <dynamicpagelist> category=ComboLock category=20160705 </dynamicpagelist>
- Double Hybridization (C Probes+Antibodies) <dynamicpagelist> category=ComboLock category=20160707 </dynamicpagelist>
- Million Fold Test (SOD1) <dynamicpagelist> category=ComboLock category=20160711 </dynamicpagelist>
- C Probes (VIM+SOD1) with Stringent Washes <dynamicpagelist> category=ComboLock category=20160718 </dynamicpagelist>
- Latch 100X and Dextran Test <dynamicpagelist> category=ComboLock category=20160725 </dynamicpagelist>
- Phusion Test <dynamicpagelist> category=ComboLock category=20160728 </dynamicpagelist>
June 2016
- Stage 2 Test (C Probe, VIM, 6-23-2016) <dynamicpagelist> category=ComboLock category=20160623 </dynamicpagelist>
- Antibody Stage 2 Test 1 (6-27-2016) <dynamicpagelist> category=ComboLock category=20160627 </dynamicpagelist>
- Antibody Stage 2 Test 2 (6-28-2016) <dynamicpagelist> category=ComboLock category=20160628 </dynamicpagelist>
- C Probe SOD1/VIM Test 1 (6-29-2016) <dynamicpagelist> category=ComboLock category=20160629 </dynamicpagelist>