Daniel:Notebook/HiResChrPaint/2013-9-4
Jump to navigation
Jump to search
BSPP Control (Started 09/03/2013)
DpnII Digestion (Started 09/03/2013)
3. Column Purification, elute with 30 uL EB 4. Measure concentrations in nanodrop
Nanodrop Results
TBE Gel
1. Lanes; (5.5 uL TBE; 2 uL 6x buffer, 0.5 uL sample; load 7 uL for all)
Lane | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
Sample | 25bp ladder | BSPP 1CD | BSPP 2AB | BSPP 2CD |
2. Run for 25 minutes at 200V